Pages

Sunday, November 2, 2014

The Orphanage Plumbing: Before and After

THE RESTROOMS... BEFORE AND AFTER: 

The bucket bath cubby (left) and the "toilet" (right and; below) were torn down.  Previously there was no water to either of these areas.





The only water source was a tap in the corner of the property.  Because there was no security wall, there was often vandalism... resulting in no water. 


 
  
A new shower and toilet were installed, with  a new big green water tank, to make sure that there is always enough water for the kids to shower and use the new "flushing" toilet.  Water lines were run to carry the water to the showers and toilets, and the inside and outside kitchens.  This is the most complete plumbing in the area!


 
 
 
 
 
 
 
 What more can we say?!!  The shower was a huge hit! 



 
SEPTIC TANK: 
The septic system was repaired and cleaned and enlarged... with a huge secondary drain field under the back yard. 

BEFORE:



AFTER:
 


THE NEW SEPTIC COVERS:



No comments:

Post a Comment